
Title
2025 and 2026 Capital Completeness Graphic
Text Version of Image
The graphic continues two circles.
The outer circle represents a period of 10 years, with hash marks at every quarter of the circle representing a 2.5 year period. An arrow is located to the right of the top of the circle.
The inner circle is a pie graph, showing two data points:
- Complete: 91%
- Under Construction: 9%
