To:
- Pikes Peak Rural Transportation Authority (PPRTA) Board of Directors
- Pikes Peak Rural Transportation Authority Citizen Advisory Committee (CAC)
From: Joshua J. Palmer, P.E., County Engineer
Date: August 14, 2024
CONTRACT
Project: Beacon Lite Road Project (2015-2024 Capital Program), Property Acquisition – Spencer Family Partnership LLLP; Parcel 123
Contract Amount: Total: $150,000.00; PPRTA $150,000.00; Other $ 0
Type: (Choose all that apply)
- ☒ Capital
- ☐ Maintenance
- ☐ Transit
- ☐ Consultant
- ☐ Equipment
- ☐ Construction
- ☐ Materials
- ☐ Personnel
- ☒ Other (description) – property acquisition
Project Description: The El Paso County Department of Public Works requests approval of the acquisition of a Permanent Easement (PE-123) and Temporary Easements (TE-123) (collectively “the Parcels”) from Spencer Family Partnership LLLP (Parcel 123) necessary for the construction of the Beacon Lite Road Project. These parcels are located in unincorporated El Paso County near Monument. The final settlement is $150,00.00.
The Project appraisal recommended a value of $106,000.00 for parcel 123 and offer to acquire the Parcel referenced above was presented on July 15th, 2024. An independent appraisal by the owner recommended a value of $171,800.00 Negotiations were made between the County and the owner’s representative to purchase the Parcel, and negotiations led to an administrative settlement of $44,000.00 for a combined total of $150,000.00. The purchase is reasonable, prudent, and in the public interest.
The Beacon Lite Road Project extends from the I25 west off-ramp to Indi Drive and Beacon Lite Road from the intersection of County Line Road to Wakonda Way. The Project generally includes paving, regrading, realigning, and associated drainage improvements. The drainage improvements include two detention ponds, curb and gutter, and a storm sewer system. Two retaining walls will be necessary to correct the vertical sight distance deficiencies.
Acquisition of this property will accommodate the proposed realignment of Beacon Lite Road to meet engineering standards. Funds for this project will come from the PPRTA Capital Funds Account 06.20.5060001 for El Paso County
VENDOR INFORMATION
Vendor: N/A
Contract No.: N/A
Contract Term (start/end dates) / Duration: N/A
FINANCIAL INFORMATION
| Budget Category | Project Category | Task Order Amount | Funds Available | 2024 Budget Amount | Budget Code |
|---|---|---|---|---|---|
| ☒ Capital ☐ Maintenance ☐ Transit | $150,000.00 | $15,938,726 | $18,700,000.00 | 06.20.5060001 |
Comments: 2023 Budget minus spent in 2023
AWARD PROCESS
- ☐ IFB (Invitation for Bid)
- ☐ RFP (Request for Proposal)
- ☐ Sole Source
- ☒ Other
Comments:
Attachments:
- ☒ Location Map
- ☐ Award Process Document
- ☐ Final Design Scope and Fee
Location Map

Image title
Beacon Light Road Project 128558 Parcel 123
Alternative text for image
The map contains labels for Interstate 25, Monument Hill Road, Misty Acres Boulevard, Beacon Lite Road, Wakonda Way and Spring Valley Road; and parcels labeled Permanent Easement 123 and Temporary Easement 123.
Permanent Easement 123 is highlighted in light blue, northeast of the intersection of Beacon Lite Road and Wakonda Way, measuring approximately 50 feet wide and 100 feet long, with the long edge running adjacent to Beacon Lite Road. Temporary Easement 123 surrounds the permanent easement section on the north, east and south section. The north section extends approximately 30 feet north and northeast of the permanent easement; the east section extends approximately 10 feet beyond the permanent easement; and the south section extends approximately 100 feet beyond the permanent easement.