Town of Green Mountain Falls—Maintenance Projects

The town has three perpetual road projects currently underway. The Erosion Control Project and the Road Rehabilitation Project both have equal priority and ultimately work together. Sixty percent of the streets are of aggregate roadway surface and over the course of time have eroded to the point of requiring between 7 inches and 27 inches of lift in an environment where grades exceed 20 percent and pitches are greater than 6 percent.

During late 2013, the public works department prepared roadway surfaces and completed application of “road saver” chloride as part of the Road Rehabilitation Project.